spacer image spacer image spacer image spacer image spacer image spacer image spacer image spacer image spacer image
spacer image Sub floor preparation

Step by step guide
spacer image
INSTALLATION
1.Sub floor preparation
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
CLEANING
   
Vehicle inspection
Before installing Altro Transflor do a vehicle inspection.

Check the subfloor is fastened (fixed) properly and all heavy overhead work is complete.

All other tradesmen must be clear of the area.
  Subfloor preparation
Next, prepare the subfloor in the appropriate way.

Fill all holes, gaps and fasteners
(fixings) with a quality flexible filler.

Sand entire subfloor to remove paint, caulking (sealant) and debris and even all joints.
  Finally sweep subfloor free of all dust and debris and check to ensure against excess moisture.

N.B. Metal subfloors must be free from grease and corrosion and should be abraded.

G.R.P. subfloors should also be abraded.
 
©Altro Group 2002.
Altro Transflor™, Altro Transflor Gallium™, Altro Transflor Tungsten™, Altro Transflor Meta™, Altro Transflor Chroma™, Altro Transflor Paint Box™, Altromastic™ are trademarks of Altro Limited.